JHPang Jun Han

Projects

In testing

SI Bore Log Check: checking bored piles against the soil report as they're drilled

Role

Concept, process design and build (with Claude AI)

Where

in-house, at the Malaysian piling and foundation contractor where I work

Dates

19–20 Nov 2026 (v1 → v16 in two days)

Status

Built and ready for testing. Waiting on internal sign-off before site rollout.

Stack

Single-page web app, built-in database, AI document reading (PDFs and photos)

One-liner

A web app that turns a soil investigation (SI) report into an "expected bore log" for every bored pile. It checks what the site actually finds against it as they drill, and stops concreting until design has confirmed the pile length.

What it does

  • SI: AI finds and reads every borehole log in an SI report (PDF or photos). It builds an SI summary, bore logs in RL (reduced level), SPT N vs RL tables and charts, and exports to Excel.
  • Design: AI drafts the design parameters from the SI (skin friction, end bearing, rock socket, factor of safety, hard-layer rules), and an engineer approves the draft by name. It handles point load test tables, pile layout zoning (the worst borehole in a zone governs), pile schedules (typed, or read by AI from a spreadsheet, PDF or photo) and reinforcement types. One click generates the design for every pile: shaft length, rock socket, toe level, governing borehole, reinforcement and concrete grade.
  • Site: The site engineer keys in a pile number and sees the design data plus the expected bore log. They log the bore log in 0.5 m steps (English or Malay), plus casing, rig, groundwater and the point load test sheet (AI reads it and recalculates). They also log the steel cage and concreting records (truck, delivery order, volume, tremie).
  • Checks: The app compares the site log with the SI (hard layer, rock level, design-set limits). It advises a pile length, flags problems to design automatically, and shows HOLD or CLEAR before termination and concreting. It also produces the bored pile record.
  • Alerts: Design decides each flag and confirms every pile's termination length.

Key design principles

  • AI advises; engineers decide. Every pile length is confirmed by design.
  • Hard hold point: no concrete until flags are cleared, the length is confirmed and the site engineer signs.
  • Accuracy first: AI never guesses an unclear reading.
  • Automate everything that doesn't need a person.

Now: testing with a clean dataset; finalising a few engineering values (rock socket factors, tremie and concrete cut-off allowances) and the site PDF export.

Related: AI back office · Article: Running a construction back office with five AI agents and one PC